For Dominator 2023, MFX Engineering was responsible for the complete rigging of the festival’s impressive centerpiece structure.
The object measured 29 meters wide, 27 meters high, and had a total weight of 13,000 kg. It was lifted into position using two cranes, placed with precision against the stage construction.
The internal structure was built using a combination of FD34, FD44, ST, and TT truss. To safely hoist the entire piece as one unit, we engineered and fabricated custom steel lifting brackets. By lifting via a pulley system, we ensured an even distribution of the load across the structure — guaranteeing both stability and safety during the build-up.
This project is a strong example of MFX’s expertise in handling large-scale, high-impact event structures with technical precision and reliability.