Dominator Festival 2023

Information about.

For Dominator 2023, MFX Engineering was responsible for the complete rigging of the festival’s impressive centerpiece structure.

The object measured 29 meters wide, 27 meters high, and had a total weight of 13,000 kg. It was lifted into position using two cranes, placed with precision against the stage construction.

The internal structure was built using a combination of FD34, FD44, ST, and TT truss. To safely hoist the entire piece as one unit, we engineered and fabricated custom steel lifting brackets. By lifting via a pulley system, we ensured an even distribution of the load across the structure — guaranteeing both stability and safety during the build-up.

This project is a strong example of MFX’s expertise in handling large-scale, high-impact event structures with technical precision and reliability.