At the Muziekgebouw aan ’t IJ in Amsterdam, a striking concert installation featured a suspended tree trunk structure hanging above the audience. This unique scenic element was composed of multiple individual logs, each rigged separately to the ceiling.
This modular setup allowed us to position the “Boris Boom” in any desired configuration — creating a dramatic visual presence while maintaining full technical control.
A perfect showcase of the precision, flexibility, and creativity that define MFX Engineering’s approach to complex, custom-made solutions.